In October 1990, Laing's London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993
Pick your License
Altering Atrium Builder Burst Ceilings Contract Creating Enable Escalators Faced Finally Fitting Floors Formed Installation Laing Laing S Level Mezzanine Mincing Minster Modernism Partnership Restore Setback Severely Steelwork Suspended Swept Underside Underwriting X000d
Features In These Collections
> Contributors > EHR