Graythorp, Graythorp, Hartlepool, Hartlepool
A team of Laing workers measuring a large metal tube in one of the welding huts at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. By 1972, one thousand men were working on site to build a tubular structure which would support a drilling rig in the North Sea destined for the Forties Oilfield
Picture No
13460755
Media ID
45383634
Size
5228px x 5258px
(2.9MB)
Credit
© Historic England Archive / John Laing Photographic Collection / Mary Evans
Source
John Laing plc - Historic England Archive
Date
1972
Pick your License
Build Constructed Contractor Destined Drilling Fabrication Fixed Graythorp Hartlepool Huts Laing Measuring Offshore Oilfield Pipelines Rigs Shed Thousand Tubular Welding
Features In These Collections
> Contributors > EHR





























