Hertfordshire
Widening works on the M1 in Hertfordshire, showing slipform paving machines laying the surface of a new road alongside the existing carriageways.Starting in 1981, widening work was carried out on the M1 between Junctions 5 (South Watford) and Junction 8 (Hemel Hempstead). The aim was to convert the~existing two-lane carriageways from Junctions 5 - 7 and three lane carriageways from Junctions 7 - 8 into three lanes southbound, three lanes northbound from Junctions~5 - 6, and four lanes northbound from Junctions 6 - 8
Picture No
13460872
Media ID
45384686
Size
5161px x 6533px
(5.8MB)
Credit
© Historic England Archive / John Laing Photographic Collection / Mary Evans
Source
John Laing plc - Historic England Archive
Date
1982
Pick your License
Alongside Builder Carriageways Convert Existing Hemel Hempstead Hertfordshire Junction Junctions Laing Lanes Motorway Northbound Paving Southbound Starting Watford Widening
Features In These Collections
> Contributors > EHR





























