M6 Motorway, M6, Acton Trussell and Bednall, Staffordshire
A Laing worker carrying out surveying during the construction of the Stafford/Wolverhampton railway bridge (Bridge 302) on Section A of the Birmingham to Preston Motorway (M6). The work on the Birmingham to Preston Motorway (M6), between junctions J13 to J16 started in June 1960 and was carried out by John Laing Construction Ltd. Section A was 51/4 miles in length between Dunston and Whitgreave. This bridge is located at grid reference SJ
Picture No
13460580
Media ID
45379322
Size
5296px x 5327px
(5.0MB)
Credit
© Historic England Archive / John Laing Photographic Collection / Mary Evans
Source
John Laing plc - Historic England Archive
Date
1961
Pick your License
Acton Builder Dunston Grid Junctions Laing Motorway Reference Staffordshire Surveying Theodolite Whitgreave
Features In These Collections
> Contributors > EHR





























