North Cotes, East Lindsey, Lincolnshire
A view of the launch site of the Northcoates pipeline, showing Laing Pipelines buoys in the foreground with the pipeline and lifting equipment in the background.The civil engineering work on the Northcoates oil pipeline was carried out by Laing Pipelines along with French companies Entrepose and GTM, and the main contractor for the dredging work was Dredging and Construction Company along with Adriaan Volker of Rotterdam. Over two miles of 36 inch diameter pipeline, encased in concrete, was pulled out to sea in the Humber Estuary on 16th June 1970
Picture No
13460840
Media ID
45384272
Size
5194px x 5253px
(3.6MB)
Credit
© Historic England Archive / John Laing Photographic Collection / Mary Evans
Source
John Laing plc - Historic England Archive
Date
1970





























