Second Severn Crossing, M4, South Gloucestershire
A view of the construction of the Second Severn Crossing, showing cranes on platforms and concrete caissons installed in the River Severn.The Second Severn Crossing took four years to build and was a joint civil engineering project between Laing Civil Engineering and the French company GTM. The work started in April 1992 and the opening ceremony later took place on 5th June 1996. The crossing is a cable-stayed bridge which stretches over 5000 metres across the River Severn, 3 miles downstream from the Severn Bridge which opened in 1966
Picture No
13460912
Media ID
45383449
Size
5301px x 5353px
(3.9MB)
Credit
© Historic England Archive / John Laing Photographic Collection / Mary Evans
Source
John Laing plc - Historic England Archive
Date
1993
Pick your License
5000 Build Cable-stayed Caisson Caissons Concrete Cranes Downstream Installed Joint Laing Laing-gtm Platforms Severn Stayed Stretches Waterscape
Features In These Collections
> Contributors > EHR





























