Skip to main content



 : Africa - Egypt


Africa - Egypt

Dec. 12, 1964 - Salvaging the Abu Simbel Temple latest stage in the Aswan Dam project.: The mammoth project of salvaging of the Abu Simbel Temple is now well under way and will reach its most decisive stage when the provisional dam surrounding it is completed. The great Temple will then be dissected into 1, 000 blocks of 20 tons each and rebuilt 15000 metres above the original site. The past few weeks caused much tension in the project as the 12, 000 workers 90 engineers and 40 Foreign experts struggled against the unexpected high flood waters of the Nile. The Temple has to be rebuilt before the middle of 1966 when the level of the water in the NASR lake will be reaching 145 metres that is 10 metres higher than the sorrounding £ 2, 500 temporary dam erected around the Temple. First stage of cutting the temple will be the ceiling reached by digging down the top of the mountain with bulldozers. A huge aluminum tunnel has been installed at the tunnel entrance to the Temples to enable workers to continue with their delicate work when the facades are covered with sand. It is intended that the Temple should retain its original appearance when re-erected 1500 feet above its original site. Photo shows foreign archaeologists together with Egyptians workers now perform the task of covering the four Statues of Ramses with sand for removal of the statues

Picture No
13249287
Media ID
47014335
Size
4374px x 5671px (1.9MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

1500 15000 Aluminum And Pound Archaeologists Aswan Blocks Bulldozers Caused Continue Decisive Delicate Digging Dissected Egyptians Enable Erected Experts Facades Higher Installed Intended Level Mammoth Nasr Provisional Ramses Re-erected Reach Reached Reaching Rebuilt Removal Retain Salvaging Simbel Struggled Surrounding Task Temples Temporary Tension Tons Unexpected


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram