Skip to main content



 : Architecture - Construction - Design - Housing


Architecture - Construction - Design - Housing

Feb. 28 The first of the stones taken from London bridge - being stacked by the workmen on the edge of the bridge - ready to be numbered and stored. LONDON BRIDGE GO STILL TO PIECES. The difficulties of unbuilding a bridge seem to be considerably more than those of building one; unbuilding as opposed to demolishing. And that is exactly what is happening to London Bridge. For its export o Lake Havasu, in Arizona - the bridge must be literally taken to pieces, stone by stone. And each stone of the bridge, which was beautifully built in 1831, must be numbered according to a master plan. And no stone must be cut or broken though some weigh up to three tons. Then they are carefully stored in order - so that they can be put together again, five thousand miles away. And to prevent the most demoralising disaster, steel supports are built under the stone arches while the work is going on - they can't have London Bridge falling down

Picture No
13207898
Media ID
46961309
Size
5627px x 4404px (1.7MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

1831 According Arizona Beautifully Cant Carefully Considerably Demolishing Difficulties Exactly Export Happening Havasu Literally Numbered Opposed Prevent Seem Stacked Stored Supports Though Thousand Tons Weigh Workmen


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram