Skip to main content



 : Architecture - Construction - Design - Housing


Architecture - Construction - Design - Housing

Jun. 06, 1961 - INSTALLATION OF FINAL UNIT OF HAMMERSMITH FLYOVER. The erection of the main superstructure of the Hammersmith flyover - started last October - was completed today with the ceremonial placing of the last pre-cast unit. This represents 81/2 months intensive effort in erecting the 16 spans totalling 2, 043 feet in length - an average of 1 span every 17 days. The flyover scheme (costing £1, 300, 000) is part of the Great West Road Improvement - the London section of which is costing £4, 300, 000. Keystone Photo Shows:- Looking beneath the flyover as traffic passes beneath the completed section - at Hammersmith Roundabout this morning

Picture No
13236249
Media ID
46989187
Size
5155px x 3742px (1.1MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

And Pound Average Costing Erecting Erection Flyover Hammersmith Improvement Installation Intensive Passes Placing Pre-cast Represents Roundabout Scheme Span Spans Superstructure Totalling


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram