Skip to main content



 : Architecture - Construction - Design - Housing


Architecture - Construction - Design - Housing

Jun. 06, 1965 - Not in the park of a castle.... but in the new water works in Hamburg-Volkedorf is this beautiful cascade. Filtered and prepared the water comes out of this installation and then it runs through four pipes into large reservoirs. From there the water is lead to the Hamburger pipes conduit. Appendix beneath: the control-panel of the water works. The new Hamburger water works, which was developed by the technical director Dr. Wilhelm Drobek in co-operation with important industry firms, is operating automatically. It is able to deliver 45 000 cbm drinking-water and the centrifugal pumps lead water to the value of 1500 cbm the hour into the Hamburger pipes conduits. The technical installations of the new water works are one of the modernest of the world

Picture No
13251102
Media ID
47016338
Size
4563px x 3313px (1.1MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

1500 Able Appendix Automatically Cascade Centrifugal Co-operation Conduit Conduits Deliver Developed Filtered Firms Hamburger Installation Installations Operating Pipes Prepared Pumps Reservoirs Runs Value


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram