Skip to main content



 : Architecture - Construction - Design - Housing


Architecture - Construction - Design - Housing

Mar. 03, 1972 - News about the Olympic site in Munich: The technicians are already training hard for the Olympic Summer Games 1972 in Munich. For instance on the big announcement-board they are trying out the different letters and also the Olympic Emblem (photo), so that everything will work on August 26th. The announcement board measures 18, 4 x 11, 6 metres (about 57 x 35 ft.) and is controlled by a computer (with the help of 24000 light bulbs) which signals the athletics-results to the spectators. Inside of the 30-tons heavy board wires with a total length of 20 Kilometres (about 13 Miles) run. They connect the different registering devices. The small score-board (underneath the stadium-clock) shows the Olympic and world-record of the event which is taking place in the stadium at the time

Picture No
13282131
Media ID
47057786
Size
5006px x 3496px (1.6MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

Announcement Connect Controlled Devices Everything Instance Kilometres Measures Registering Signals Technicians Wires World-record


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram