Skip to main content



 : Boats - Sailing - Ships


Boats - Sailing - Ships

Aug. 08, 1961 - Sea Takes A Hand In International Power Exchange: A rough sea at Dungeness, England, gives trouble to cable workers coming ashore and frogmen give them a helping hand. The men are from the British cable lawyer working in the English Channel on a new high-power link that will enable Britain and France to exchange surplus power this year. Because of the different habits of the two countries, each has power to spare at different times. Thus one is able to carry the additional load at the other's peak period. The scheme will cost a total time of more than 2, 600, 000 but both countries are expected to show an individual annual saving of about 00, 000 and to avoid the building of new power stations, one in Britain and one in France, each costing about 2, 400, 000. Both countries will lay half of the cable under a 30 mile stretch of sea

Picture No
13236729
Media ID
46987771
Size
5654px x 4415px (1.6MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

Able Additional Ashore Avoid Cost Costing Dungeness Enable Expected Frogmen Habits Link Load Saving Scheme Spare Stretch Surplus Thus


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram