Skip to main content



 : Germany - Lithuania - Poland


Germany - Lithuania - Poland

May 05, 1956 - Reconstruction of the Stuttgart Town -Hall: After 3 years of building operations, the new Stuttgart town-hall was finished von May 4rth. The former town Hall was totally bonded out except the tower. Picture Shows: (left) The new town Hall with old tower, nearly 70 m high. Picture Shows: (Right) During the consecration in the first line from left: Architect Dipl. Ing. H.P. schmol (schmol) town-major of Stuttgart, Hirn (Hirn) minister Veit (Veit), President Heub (Heuss) Stuttgart's lord -major Dr. Klett (Dr. Klett) lord-major of Augsburg, Dr. Klaus Muller (Klaus Muller ), the lord-major of Pforzheim, Dr. Brandenburger (Dr. Brandenburger) and the 2nd architeckt Dipl. Ing. Paul Stohrer (Paul Stohrer)

Picture No
13176793
Media ID
46929226
Size
4988px x 3763px (1.3MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

Augsburg Bonded Brandenburger Consecration Dipl Except Finished Klaus Klett Muller Nearly Pforzheim Stuttgart Stuttgarts Totally Town-hall Veit


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram