Germany - Lithuania - Poland
May 05, 1956 - Reconstruction of the Stuttgart Town -Hall: After 3 years of building operations, the new Stuttgart town-hall was finished von May 4rth. The former town Hall was totally bonded out except the tower. Picture Shows: (left) The new town Hall with old tower, nearly 70 m high. Picture Shows: (Right) During the consecration in the first line from left: Architect Dipl. Ing. H.P. schmol (schmol) town-major of Stuttgart, Hirn (Hirn) minister Veit (Veit), President Heub (Heuss) Stuttgart's lord -major Dr. Klett (Dr. Klett) lord-major of Augsburg, Dr. Klaus Muller (Klaus Muller ), the lord-major of Pforzheim, Dr. Brandenburger (Dr. Brandenburger) and the 2nd architeckt Dipl. Ing. Paul Stohrer (Paul Stohrer)
Pick your License
Restrictions Only for United Kingdom
Augsburg Bonded Brandenburger Consecration Dipl Except Finished Klaus Klett Muller Nearly Pforzheim Stuttgart Stuttgarts Totally Town-hall Veit
Features In These Collections
> Contributors > KEY


