Germany - Lithuania - Poland
May 02, 1969 - This construction is shown at the moment when the two arms of the Munichs Bahn met. The construction project joined the Munich station with the East Station and traveled beneath the Isar. The tunnel was 609m and was 19 meters beneath the valley floor. The direction was guided by laser beams. The project was the most difficult of the Munichs Bahn
Picture No
13267814
Media ID
47035449
Size
3590px x 5035px
(1.2MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone


