Skip to main content



 : Montage showing relative size of oil module and Tower Bridge


Montage showing relative size of oil module and Tower Bridge

Oct. 10, 1974 - British Petroleum in Battle Against Waves for North Sea Oil: In the face of worsening weather, and at a cost of 250, 000 a day, British Petroleum in a battle to get the first commercial North Sea oil ashore by next summer, and is at present engaged in placing the five remaining prefabricated modules on their platforms in the huge Forties Field, 110 miles north of Aberdeen, Scotland. The first 1750-ton module was hauled onto the Graythorp platform on October 14th. They are hoping patches of calm weather will enable them to fit the five remaining modules on top of the Graythorp 1 platform support system. A module is a prefabricated part of the platform made on land and brought out on a special barge. This montage shows how a platform and its module, 390ft high and welghing 57, 000 tons, would dwarf Tower Bridge

Picture No
13291222
Media ID
47078010
Size
4415px x 5511px (1.2MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

Aberdeen Ashore Barge Calm Compared Comparison Cost Dwarf Enable Engaged Graythorp Hauled Hoping Module Modules Montage Onto Patches Petroleum Placing Platforms Prefabricated Relative Remaining Tons Worsening


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram