Skip to main content



 : United Kingdom - Ireland


United Kingdom - Ireland

Mar. 03, 1973 - Maplin Model will help with Reclamation Work: There was a Press visit today today to see the model - one of the Largest of the proposed reclamation work for the third London Airport at Maplin. Built by the Hydraulics Research Station at their headquarters at Wallingfol in Berkshire, the model simulates an area bounded by Felixstown the thames Estuary from Woolwich Reach- the proposed site of the Thames Flood Barrier - to Margate and the Essex Coast and extends more than 30 miles offshore. It is housed in a new steel-framed building measuring 103meters by 70metres and will be used to predict the effect of reclamation on tidal levels and changes in the Hydraulic characteristics of estuaries and channels close to Maplin. Picture Shows Eldon Griffiths, Parliamentary Under-Secretary of State, Department of the Environment -Seen pointing out the position of the proposed No.3 runway - on the reclaimed land, with the aid of the model today

Picture No
13285776
Media ID
47061898
Size
4411px x 5548px (1.8MB)
Credit
(c) Keystone Pictures USA/ZUMAPRESS.com/Mary Evans
Usage Restrictions
Editorial Use Only - No Property or Model Releases. For any non-editorial use, please contact Mary Evans direct
Source
Keystone Pictures USA

Pick your License

Please tell us the book title or ISBN

Please supply intended use


 

Restrictions Only for United Kingdom

Barrier Berkshire Bounded Changes Channels Characteristics Effect Eldon Estuaries Estuary Extends Griffiths Housed Hydraulic Hydraulics Levels Maplin Margate Measuring No.3 Offshore Parliamentary Predict Proposed Reclaimed Reclamation Runway Simulates Tidal Under-secretary Woolwich


Features In These Collections

> Contributors > KEY



 
© Copyright Mary Evans Picture Library - All Rights Reserved 2026
Powered by Media Storehouse®
We accept all major payment options so you can pay for the things you need in the way that is most convenient for you
Facebook     Twitter     Instagram