Construction of electric power plant - water powered turbine
Gargantuan construction of Lipno dam continued without stop and under any weather condition to be completed in time. Concrete was poured in freezing temperatures so that the dam would be able to fill up during spring snow melt. Several such dams were constructed on Vltava River to prevent flooding while efficient electricity producing turbines were installed. Czechoslovakia 1958. (CTK Photo Bedrich Krejci)
Picture No
13806269
Media ID
45411503
Size
1898px x 2954px
(1.5MB)
Credit
© CTK Photobank / Mary Evans
Source
Tachezy jan - CTK





























