Reactor for urea production, Josef Vlk, Bedrich
JANUARY 19, 1973 - A huge synthesis reactor for the production of urea with an output of 1050 tons in twenty-four hours was shipped from Brno on 18 January by the Kralovopolska Engineering to the chemical plant in Piestoritz in the German Democratic Republic. The reactor is one of the largest products in the history of the company in the field of high-pressure equipment. It has a diameter of 2, 700 millimetres, weighs 214 tonnes and is thirty metres long. Group engineer Josef Vlk and assembly workshop manager Bedrich Fleischinger prepare the reactor for shipment. (CTK Photo/Frantisek Nesvadba)
Pick your License
Restrictions Only for Ireland and United Kingdom
1050 Bedrich Brno Chemical Diameter Frantisek High-pressure Kralovopolska Millimetres Nesvadba Output Piestoritz Prepare Reactor Shipment Shipped Synthesis Thirty Tonnes Tons Twenty-four Urea Weighs
Features In These Collections
> Contributors > CTK





























