New Tube Railway for Mail by G H Davis
A diagram giving the details of the post office tube between Paddington and Whitechapel, built at the time at a cost of £1, 500, 000. The line began construction in 1913, but was delayed by the First World War, as well as rising material costs. The diagram features details on how the system worked, as well as a rail map
Picture No
10638347
Media ID
46093040
Size
4032px x 6039px
(4.3MB)
Credit
© Illustrated London News Ltd/Mary Evans
Source
Illustration by George Horace Davis in The Illustrated London News', 11 June 1927
Date
1927
Pick your License
Diagram Drivers G.p.o Horace Mails Paddington Postal Whitechapel
Features In These Collections
> Contributors > ILN





























