Rotherhithe Road Tunnel - Burrowing Under the River Thames
Men working in dark conditions, topless due to the temperature in the eighties. Excavating the clay soil at the rate of about five feet per day. Temporary tram lines were set up with iron trucks, transporting bags of cement, water and baulks of timber to the Greatend shield at the head of the tunnel, when emptied the trucks where loaded with soil to be removed
Picture No
11034651
Media ID
46101460
Size
4088px x 5604px
(6.5MB)
Credit
© Illustrated London News Ltd/Mary Evans
Source
Drawn by Victor Prout in The Sphere', 20 October 1906, page 61
Date
1906
Pick your License
Burrowing Constructed Crosses Digging Emptying Excavate Excavating L.c.c Pick Removal Removing Rotherhithe Soil Topless Transporting Tunnels Workmen
Features In These Collections
> Contributors > ILN





























